IGEM/TD/101
Adoption of pipesystems by a GT - management of UIP
activities
Edition 2 of IGEM/TD/101 has been published and is now
available. It reflects changes in practices and terminology and has
been prepared by IGEM's Panel comprising representatives of
District Network Operators, the AIGT, independent gas transporters,
SBGI UIP section, GIRSAP and Consultants.
IGEM/TD/101 sets down the minimum management requirements for
the laying of newly constructed Natural Gas mains and services
(pipelines) including associated installations, for example a PRI,
having MOP of 7 bar, for adoption by a GT.
IGEM/TD/101 Edition 2 can be ordered online using the following
link IGEM/TD/101 Edition 2.